Product Details:
Brand Name
YIMEISITE
Place of Origin
China
Certification
ISO 9001
Payment & Shipping Terms:
Minimum Order Quantity
1
Price
USD 20,000-30,000 per set
Packaging Details
Export non-fumigation wood box
Delivery Time
45 days
Payment Terms
TT or LC at sight
Supply Ability
5 sets
| Safety Features: | Emergency Stop, Overload Protection, Safety Gear | Power Supply: | AC or DC |
| Speed: | 0.15 M/S | Drive System: | Screw Drive |
| Capacity: | 500-5000 Kg | Maintenance: | Low Maintenance |
| Control System: | Microprocessor-based | Travel Height: | Up to 15 M |
| Highlight: | Emergency Stop Screw Drive Elevator,Screw Drive Elevator 5000Kg,5000Kg Screw Driven Lift | ||
Product Description
Screw drive elevator · heavy-duty, 500–5,000 kg
A screw drive elevator is a machine with a threaded shaft instead of a cable, a drum or a hydraulic ram — and the reasons to buy one are structural, not cosmetic.
This page documents one heavy-duty screw-driven model: a 500 kg to 5,000 kg rated load, 0.15 m/s travel speed, 2–10 stops and up to 15 m of travel, driven by a rotating screw and a travelling nut, powered by AC or DC and controlled by a microprocessor panel. Every figure below is read off this page's own parameter tables. Where a table is silent, the text says so instead of filling the gap, and the two places where the page is thin are marked as open items rather than smoothed over.
What this page settles, and what it leaves to your project
- Fixed by the specification tables: screw drive, 500–5,000 kg capacity, 0.15 m/s, travel up to 15 m, 2–10 stops, automatic centre- or side-opening doors, AC or DC supply, microprocessor control, low maintenance, and standard safety gear: emergency stop, overload protection and safety gear.
- Commercial terms on the same sheet: brand YIMEISITE, origin China, ISO 9001 listed under certification, minimum order quantity 1 set, USD 20,000–30,000 per set, export non-fumigation wood box, 45-day delivery, TT or LC at sight, supply ability 5 sets.
- Not on this sheet: a pit depth, an overhead clearance, a shaft dimension, a noise figure, a warranty term in the parameter table, and any standard beyond ISO 9001. Those are named as open items in sections 4 and 5 rather than guessed at.
- The term is ambiguous, so this page disambiguates it: the same search returns screwdrivers, screw conveyors (augers), screw jacks and dental instruments. This page is about the lifting machine — a rotating screw and a travelling nut carrying a cabin or platform.
The short version. Screw drive carries a load on a threaded shaft, has no machine room and no hydraulic fluid, and holds position mechanically when the motor stops. In exchange it runs at one slow speed, and above a few floors its safety case stops being a matter of brand and starts being a matter of documents. If you are weighing this against a hydraulic freight lift or a traction machine, sections 2, 3 and 5 are the ones that decide it.
1. Whether a screw drive elevator fits your building
A screw drive elevator is a lift whose car or platform is carried by a threaded steel shaft running the height of the travel. A motor turns the shaft; a drive nut threaded onto it travels up and down and takes the car with it. There is no traction sheave, no wire rope, no counterweight and — on the models built this way — no hydraulic power unit and no machine room. The load path is short and mechanical, and that is the whole appeal.
Buildings split into three groups when that mechanism meets real site conditions. The split is worth doing before anybody quotes, because the two things that kill a screw lift project — no usable pit and a load band nobody needs — are both visible at the drawing stage.
A good fit
- Retrofit into an existing building. No machine room, no separate hydraulic plant room, and no oil line to route. The screw column and the guide rails occupy the shaft; the drive sits at the top of the run. This is why the mechanism turns up so often in buildings that were not designed to carry a lift.
- A slow, short, heavy run. The page's own envelope is 0.15 m/s, up to 15 m of travel and 2–10 stops. That is a two-to-five-floor machine moving a load that would be awkward, unsafe or slow to carry by hand.
- Indoor or outdoor positions. This page's own text lists both indoor and outdoor mounting, and a weather-resistant build is one of the configurations in its own gallery. Outdoor installation is a real option here, not a marketing phrase.
- Sites where fluid is unwelcome. A screw drive has no oil reservoir, no cylinder seals and no hydraulic hose. In a food-adjacent store room, a clean workshop or a building where a leak would be a real problem, the absence of hydraulics is a technical advantage.
A poor fit
- Anyone who needs speed. 0.15 m/s is roughly 9 m per minute. A four-floor run takes about half a minute each way. For a passenger lift in an office or a hotel, that is unacceptable; for a goods run, it is usually fine.
- A structure that cannot take the reactions. A screw lift does not need a machine room, but it does need the shaft structure to carry the drive and the load path. Nobody can confirm that from a catalogue page, and this page publishes no structural drawing.
- Sites expecting a pit-free installation by default. This page's own text mentions a pitless retrofit as possible, while its parameter tables carry no pit or overhead figure at all. That is an unresolved item in this page's own content, and it is written out in section 4 rather than papered over.
- High traffic. With one screw-driven car at one speed, throughput is fixed. A busy retail mezzanine moving footfall all day will want a different machine.
Settle before you order
- The pit and overhead figure for your configuration, in writing. This page's parameter tables do not state either number.
- Whether the local authority treats your lift as a goods lift or a passenger lift. The 500–5,000 kg band and the 2–10 stops both invite that question, and the answer changes the paperwork.
- The AC or DC decision and the fuse, cable and isolator behind it. The page gives one line on this; your electrician will need more.
- The shaft opening and the route in. The screw column arrives in sections and the longest piece has to reach the shaft through the building.
How to use the rest of this page. Section 2 explains the mechanism, section 3 the load band, section 4 the site and power checks, section 5 safety, and sections 6 to 9 the applications, delivery, questions and quotation data. If you are already comparing suppliers, read section 5 first.
2. How a screw drive elevator actually works
Take the rope out of a lift and you lose the sheave, the counterweight and the traction calculation. What replaces them is a long threaded steel shaft — the screw — standing upright in the shaft, and a nut that is threaded onto it and driven to rotate. When the nut turns, it climbs the screw; when the nut stops turning, it stays where it is. The car or platform is bolted to the nut assembly and travels with it.
That single mechanism explains almost every property of a screw drive elevator: why it does not fall if the power is cut, why it has no machine room, why it runs at one modest speed, and why the number of floors matters more to this machine than to any other type.
1. Drive motor
The motor turns the nut rather than hauling a rope. On this model the speed it imparts is written as 0.15 m/s, and the same figure applies whatever the load between 500 kg and 5,000 kg.
What the mechanism buys you
- Self-holding by geometry. Because the load is carried on a thread, the car does not need a brake to stay put between runs — a screw drive holds its position when the motor stops. That is the mechanical reason a screw lift is described as not free-falling, and it is a property of the thread rather than a feature bolted on.
- No machine room and no plant room. There is no hydraulic power unit to house, no oil tank, no pump and no cylinder to anchor below the shaft. This page's own text lists no machine room as a property of the drive, and where a machine room has to be built or carved out of an existing building, that is usually the largest single saving.
- No hydraulics in the building. A hydraulic lift carries a column of oil and, if it uses a jack below the car, a cylinder that normally sits in the ground. A screw lift has neither. For a retrofit into an occupied building, or a position where a leak would be a genuine problem, that difference decides the specification.
- Low maintenance, as this page states it. The sheet lists maintenance as Low Maintenance. That is a qualitative line, not a schedule: the page gives no interval, no consumable list and no service checklist, so the interval has to come from the supplier in writing (see section 7).
Where the mechanism costs you
- Speed is fixed and modest. 0.15 m/s is the only speed listed on this page. You cannot buy a faster screw lift from this sheet, and you cannot tune the speed afterwards, because it follows from how fast the nut is driven around the screw.
- Travel height is where the doubt lives. The screw has to be as long as the travel, and a longer, thinner column is harder to keep true. This page states travel up to 15 m and 2–10 stops, but publishes no deflection or alignment figures. Section 5 deals with the two-floor criticism directly, because that is the argument you will meet when you research this drive type.
- One car, one shaft, one speed. There is no counterweight to balance, so nothing to trade against capacity, and no way to run a second car on the same screw. Throughput is what one car at 0.15 m/s gives you, and it is worth calculating before purchase.
- The screw is a wear item and a precision item. Thread condition, lubrication and alignment are what keep a screw lift quiet and accurate. The page calls the product low maintenance; the honest consequence is that the maintenance it does need is specific, so the spares position for the nut assembly matters more than it would on a rope lift.
Compare the right thing. A screw drive elevator is usually quoted against a hydraulic lift of the same capacity, not against a traction machine: hydraulics are faster over short rises, while the screw is simpler, needs no plant room and holds position without a pump. The blog guide to screw-and-nut lifting systems sets out the mechanism in more detail, and the screw driven elevator range page shows how this model sits in the family.
3. Load and speed: reading the 500–5,000 kg band
This page gives one capacity line: 500–5,000 kg, selectable. One line for a factor of ten is a wide band, and a wide band is exactly where buyers make expensive mistakes in both directions — buying three tonnes of machine to move two people, or buying a domestic platform to move pallets. The pages that rank for this term explain what screw drive is; almost none of them state where the load band actually changes the project. So this section does that instead.
Rated load: pick a point in the band
Rated load on this page's table
5,000 kg
Band: 500–5,000 kg selectable · speed 0.15 m/s · travel up to 15 m · 2–10 stops
500 kg — the light end of this machine
Half a tonne is one person plus a load, or a trolley of stock. At this point the argument for buying a heavy-duty screw lift is not the load at all — it is the absence of a machine room and the fixity of the mechanism. If 500 kg is genuinely your ceiling and you are not moving goods, a lighter screw lift will usually be cheaper; the page's own related range includes a compact screw-driven home lift built for that job.
1,000 kg — the working band for a house or small shop
A tonne covers furniture, a loaded pallet truck pushed on, garden machinery or two people with equipment. This is the band where a screw drive starts to look like the right answer for a large house or a small commercial unit, because the loads are heavy enough to justify a machine and the run is short enough that 0.15 m/s is not a problem.
2,000 kg — goods handling with a small footprint
Two tonnes is where the lift stops being a convenience and becomes part of a process: stock transfers between a warehouse floor and a mezzanine, deliveries into a retail back area, materials into a workshop. Two things have to be settled at this point rather than later — the shaft structure that carries the drive, and the running time, because a two-tonne load at 0.15 m/s is not fast.
5,000 kg — the top of the band, and a different conversation
Five tonnes is machinery, pallets and bulk stock. Where a project asks for a screw drive lift 5000 kg in rating, three questions stop being optional. First, what does the local authority call this installation — goods lift or passenger lift — because the answer decides the inspection regime. Second, what does the structure take, since the load and the drive reactions both land on it. Third, what documentation accompanies the safety features, because at this scale the safety case is documents rather than brand. This page states the 5,000 kg rating, emergency stop, overload protection and safety gear, and ISO 9001; it does not state a structural drawing, a pit figure or a standard beyond ISO 9001, so those are the items to obtain in writing.
The four points above are positions in this page's stated 500–5,000 kg band, not separate catalogue models. The specification figures are the page's own; the notes against each point describe what changes in the project, and are written as questions to settle rather than as machine data.
Why 0.15 m/s is not a defect
Buyers who arrive from a passenger-lift background read 0.15 m/s as a fault. It is better read as the price of the mechanism. At 0.15 m/s a 3 m floor-to-floor run takes about twenty seconds plus door time, and a five-stop installation serving 15 m takes roughly two minutes end to end. For a goods movement triggered a few dozen times a day that is irrelevant; for a building where people queue it is disqualifying, and no amount of specification fixing changes it. So the useful question is not "can it go faster" but "how many trips per hour do I need" — if the answer is under about twenty, a screw drive is comfortable.
4. Site conditions and the AC or DC supply
A screw drive elevator is easier on a building than most machines of its capacity, but it is not indifferent to the building. Three things have to exist before it can be installed: a shaft or a space that can be closed into one, structure capable of carrying the drive and the load, and an electrical supply sized for the motor. This section works through all three, and states plainly where this page stops short.
The specification table, line by line
The table below is this page's technical specification, with the metric figures converted for reference. Switch between the two systems with the buttons: the metric values are the ones the page publishes, and the imperial values are arithmetic, not additional data.
Units
Metric is the source. Imperial figures are rounded conversions of the same values, offered because a large share of enquiries for this machine come from North America.
| Parameter | Value on this page | What it decides in practice |
|---|---|---|
| Drive system | Screw drive | The mechanism and everything that follows from it: no machine room, no hydraulic oil, self-holding at rest. |
| Rated load | 500–5,000 kg (500–5,000 kg)(1,102–11,023 lb) | Which loads the machine is bought for, and whether the authority treats it as a goods lift or a passenger lift. |
| Travel speed | 0.15 m/s (≈30 ft/min) | Trip time and throughput. Single-speed: it cannot be raised at order stage. |
| Travel height | Up to 15 m (≈49 ft) | How many floors the machine can serve, and how long the screw column has to be. |
| Stops | 2–10 | Landing count, and therefore the number of doors, interlocks and call stations. |
| Door type | Automatic, centre or side opening | Landing layout and the clear opening you can give a trolley or a pallet. |
| Power supply | AC or DC | Whether the site uses a mains supply or a DC source; the sheet gives no voltage here. |
| Control system | Microprocessor-based | Levelling accuracy, fault reporting and how the lift is configured at commissioning. |
| Safety features | Emergency stop, overload protection, safety gear | The three devices the machine is specified with; see section 5 for what each one is. |
| Maintenance | Low maintenance | A qualitative line only — this page publishes no interval, so ask for the schedule. |
| Certification | ISO 9001 | The only standard named anywhere on this page. It is a quality-management certification, not a lift safety standard. |
Two items this page does not settle
Two gaps matter enough to write out rather than pass over. First, no pit depth and no overhead clearance appear in this page's parameter tables, although the page's own descriptive text mentions a pitless retrofit as possible; those are two different statements and neither gives you a number. Second, the parameter table's electrical line reads only AC or DC, while the voltage range 220–380 V appears only in the page's descriptive table. Treat both as items to confirm in writing against your site drawing, not as figures to design from.
Power: what the AC and DC options actually mean
This page lists the supply as AC or DC. Both are single-line entries, so the practical difference has to be read together with the rest of the sheet and confirmed with the supplier. Pick an option below to see what is stated, and what still has to be asked.
AC — the default reading of this sheet
The parameter table lists AC or DC and nothing more. The page's own descriptive table narrows the AC option to 220–380 V AC. If your building has a normal mains supply, this is the configuration to quote against, and the items your electrician needs are the supply voltage and frequency, the circuit protection, the isolator position at the shaft entrance, and the cable route from the distribution board.
- Ask for: the running current and starting current at your voltage, and the recommended protective device. Neither is on this page.
- Check locally: whether 220–380 V covers your region's nominal voltage, and whether a transformer or a different motor winding is needed.
DC — listed, but not detailed
The parameter table's line is simply AC or DC, and the descriptive table marks DC as optional. Nothing on this page states the DC voltage, the current, the battery or rectifier arrangement, or the number of trips a DC supply supports. A DC configuration is normally chosen where no mains supply reaches the shaft, or where the lift has to keep working during a power failure — but that has to be designed, not assumed.
- Ask for: the DC voltage and capacity, whether the DC source is the normal supply or a standby, and what the lift does at the end of a discharge.
- Do not assume: that a DC option on a quotation means an emergency-power feature. This page does not say that, so treat the two as separate questions.
Four checks before the order is placed
Nothing here needs an engineer to start: all four can be answered from a tape measure, a drawing and a conversation with the electrician.
Site self-check 0 of 4
The outdoor question. This page's own text lists indoor or outdoor mounting, and one of the models in its gallery is described as weather resistant. Outdoors still means the same four checks: the shaft becomes an enclosure, the drive needs its own weather protection, and the landing thresholds have to shed water. The mechanism itself does not change — a screw drive has no fluid to freeze and no hydraulic hose to weather.
5. Safety devices, ISO 9001 and the two-floor question
Search for this drive type and you will meet one criticism faster than any other: that screw drive systems are safe for short distances but become dangerous beyond two floors. It is worth answering directly rather than ignoring, because a buyer who finds that claim after ordering feels misled, and a buyer who finds it before ordering deserves an answer that distinguishes between machines.
The safety line on this page is short. An emergency stop screw drive elevator is not a separate model here: the stop is standard fit, listed alongside overload protection and safety gear, and controlled by a microprocessor panel. So the useful question is not which safety options to add, but what evidence accompanies the three devices that are already specified.
What this page specifies
Emergency stop
A device that removes power from the drive and stops travel. On a screw drive the car then stays where it is, because the load rests on the thread — there is no counterweight pulling it on. The page lists this as a standard feature.
Overload protection
A device that prevents the machine from being run outside its rated load. With a 500–5,000 kg band, the overload setting is part of the configuration: the same machine frame at a 500 kg setting and a 5,000 kg setting are working to different numbers.
Safety gear
The mechanical device that grips the guide rail if the car moves faster than it should. It is the fallback for the failure of every other system, and it is the item to ask about first when a supplier's quotation mentions safety only as a list of names.
Certification listed on this page: ISO 9001 A quality-management certification of the manufacturer's process. It is not a lift safety standard, and this page names no safety standard at all — so this page claims none.
Is a screw lift safe above two floors?
The honest answer has three parts, and the third is the one suppliers usually leave out.
- First, the criticism is about a real failure mode, not about the principle. The known concern with screw-driven platforms is what happens to a long column under load and over time: alignment, thread wear and the behaviour of the mechanism if something binds. That is a design, manufacturing and maintenance question. It is not a claim that a thread cannot lift a car three floors up, and the criticism itself is normally written by suppliers of other drive types.
- Second, this page's own envelope does not stop at two floors. It states travel up to 15 m and 2–10 stops — more than two floors of travel by any normal definition. That does not prove the criticism wrong, but it does mean that the specification you are reading is not written for a two-floor product. Multi-level travel is being offered.
- Third, and this is the part that matters to a buyer: nothing on this page states which standard the machine is built or tested to, and the only certification named is ISO 9001, which is a manufacturing quality certification rather than a lift safety standard. So the correct conclusion is not "safe" and not "unsafe". It is that this page does not carry the evidence, and the evidence has to be obtained before a multi-floor installation is signed off.
Six documents to ask for when travel goes above two floors
- The build or test standard for the machine, named in writing, with the certificate or declaration that goes with it.
- The rated and test load for safety gear, and the mechanical certificate for the gear itself.
- The column alignment and deflection figures at your travel height, not at a shorter reference height.
- The maintenance schedule for the screw, the nut assembly and the lubrication, with the interval stated in months or cycles.
- The local requirement: whether your authority treats the installation as a goods lift or a passenger lift, and what inspection that triggers.
- The handover pack: drawings, wiring diagram, test record and the emergency release procedure, in the language your inspectors read.
None of those six is unreasonable, and a supplier who makes a heavy-duty screw lift should have them. What a buyer should not accept is a page like this one — a specification with no standard named — being turned into a safety assurance by a sales reply. Ask, keep the answer in writing, and treat a missing answer as a real answer.
6. Where a heavy-duty screw lift earns its money
The case for this machine is narrow and specific, which is why it works so well where it fits. It is slow, it holds position mechanically, it needs no machine room and no oil, and it will carry up to five tonnes. A high capacity screw lift is bought for those properties rather than for speed, and a heavy duty screw drive elevator is normally judged against hydraulic machines of the same capacity. Those five properties together describe a particular set of jobs.
Warehouse and factory floors
Moving pallets, machinery parts or stock between the ground floor and a mezzanine without taking a route through the main building. The load band is the reason: 1,000–5,000 kg is stock handling, and 0.15 m/s is beside the point when the alternative is a forklift, a ramp or two people and a pallet truck.
Watch: trip frequency. Stock movements are bursty, and the lift becomes a queue at shift change.
Shop and retail back-of-house
Deliveries arriving at street level into a stockroom above or below, or the reverse. Automatic centre- or side-opening doors matter here, because staff are moving cages and trolleys rather than standing still, and the clear opening decides what can be pushed through.
Watch: the doorway, not the lift. Measure the widest trolley before agreeing a door type.
Workshops and plant areas
Heavy parts, dies, tooling or raw material between levels in a workshop or plant building. A screw lift brings two advantages here that are easy to overlook: there is no hydraulic fluid line running through a working area, and no power unit occupying floor space that a shop needs.
Watch: the environment, not just the load. Dust and swarf decide the lubrication and protection routine.
Large houses, villas and estate buildings
A house lift that also has to move furniture, garden machinery, firewood, wine or a wheelchair with an attendant. This page's own descriptive text puts residential use first, and the width of the load band is what makes it credible in a house: a machine that will take 1,000 kg is not defeated by a piano.
Watch: whether the house really needs the band. Below 500 kg of real demand, a lighter screw lift is usually the better buy.
Clean and fluid-sensitive areas
Positions where an oil leak would be a compliance or hygiene problem rather than an annoyance. A screw drive has no reservoir, no cylinder and no hoses, so there is nothing to leak. The page's own descriptive text also lists hygienic interior options for hospital and hotel use.
Watch: that the cleaning routine suits the mechanism. Ask what the screw and nut need, and how often.
Outdoor and semi-outdoor positions
Yards, external stair cores and annexes, where the enclosure is a structure rather than a room in the building. This page's own text lists indoor or outdoor installation, and lists a weather-resistant model in the same family. A drive with no fluid and no hose is a practical choice for a position that freezes in winter.
Watch: thresholds and drainage. The mechanism tolerates weather; the landing levels have to shed water.
What this machine is not for
Three applications come up in enquiries and belong somewhere else. A lift in a building where people arrive in groups needs speed and traffic handling, and 0.15 m/s with a single car cannot deliver it. A site that wants the load carried through a public lobby needs a passenger-grade installation, not a goods machine with a 5,000 kg plate on it. And a project that wants the cheapest possible way to move 200 kg between two floors is over-buying: the page's related range includes purpose-built light screw lifts for exactly that job, and they cost less for the same reason this one costs more.
Read the load band against the use, not against the price. The band on this page is 500–5,000 kg, and the useful question is what the heaviest routine load will be — not what the heaviest conceivable load might be. Specifying for the exceptional load is how a goods lift ends up with a safety case and a structural requirement that the building never needed.
7. Delivery, installation and commissioning
A screw lift is a mechanical installation with an electrical connection and a document trail. The sequence below is the order the work happens in, with this page's own figures attached where they exist and everything else marked as a question to put to the supplier.
Put four things in the contract rather than discover them on site: who does the shaft work; the pit and overhead figures, written into the order acknowledgement; the electrical split between the site electrician and the installer; and the maintenance interval with the spares position for the nut assembly, which is the wear item specific to this drive.
8. Screw drive elevator FAQ
Ten questions that come up in enquiries for this machine. Every answer is tied to what this page states, and where the page is silent the answer says so.
It is a lift whose car or platform is carried by a threaded steel shaft standing the height of the travel. The motor turns a nut that is threaded onto the shaft, and the nut climbs the shaft, taking the car with it. There are no ropes, no counterweight and no hydraulic ram. Because the load sits on a thread, the car holds its position when the motor stops. This page specifies one such machine: screw drive, 500–5,000 kg, 0.15 m/s, up to 15 m of travel, 2–10 stops.
The concern you will find online is real as a question about long columns, alignment and thread wear — and this page offers up to 15 m of travel and 2–10 stops, so it is not being sold as a two-floor-only product. What this page does not contain is the evidence: it names ISO 9001 (a manufacturing quality certification) and no lift safety standard. So the answer is not yes or no. Ask for the build or test standard, the safety gear certificate, the column figures at your travel height and the local requirement, and treat those documents — not the specification page — as the basis for a multi-floor decision.
Because there is no machine room and no hydraulic plant to find space for: no oil tank, no pump unit and no cylinder to anchor below the shaft, so an existing building does not have to give up a room or floor area. This page's own text lists no machine room as a property of the drive and lists both indoor and outdoor mounting. The parts that still have to fit are the shaft itself, the longest section of the screw column and the electrical supply.
This page states a rated load of 500–5,000 kg, selectable. Five tonnes is machinery, pallets and bulk stock; 500 kg is a person and a load. The overload protection is part of the configuration, so the setting should match the load you actually specify rather than the top of the band — and where the top of the band is selected, expect the local authority to ask whether the installation is a goods lift or a passenger lift.
0.15 m/s, which is about 9 m per minute or 30 ft per minute. A 3 m floor-to-floor run takes roughly twenty seconds of travel, plus door time; a full 15 m of travel takes roughly two minutes. For goods movement that is irrelevant. For a lift where people queue, it is the disqualifying figure — and it is not adjustable, because the speed follows from the drive.
No machine room: the drive is mounted at the top of the shaft run, and this page's own text confirms there is no machine room requirement. On the pit, be careful. The page's descriptive text mentions a pitless retrofit as possible, but the parameter tables on the same page state no pit depth and no overhead clearance at all. Two different statements, and no number in either. Get the pit and overhead figures for your configuration in writing before ordering.
The parameter table says AC or DC and nothing further. The page's own descriptive table narrows the AC option to 220–380 V AC and marks DC as optional. Nothing on the page states the running current, the protective device or the DC arrangement, so those come from the supplier. Ask your electrician for the site voltage, phase and available capacity first, then have the supplier confirm the motor and protection to match.
This page describes the machine as low maintenance. That is as far as it goes: no interval, no consumable list and no service checklist are published. The items that matter on this drive type are the screw thread, the nut assembly, lubrication and alignment, plus the routine checks on the safety gear and the landing interlocks. Ask for the schedule in months or cycles and for the spares position on the nut assembly, which is the part specific to this mechanism.
This page's own text lists indoor or outdoor installation, and lists a weather-resistant model in the same family. The drive type suits it: there is no hydraulic fluid to freeze and no hose to weather. Outdoors, the shaft becomes an enclosure, the drive needs its own weather protection, and the landing thresholds have to shed water. Confirm the enclosure specification and the corrosion protection for the frame, fixings and rails.
This page publishes USD 20,000–30,000 per set, with a minimum order quantity of one set, a 45-day delivery time, payment terms of TT or LC at sight, and export non-fumigation wood box packing. Treat the range as a band that moves with the load, the travel, the stop count, the door type and the finish — and treat the scope boundaries as the part to pin down, because the price band alone does not say whether freight, installation and commissioning are inside it.
9. What a quotation for this lift needs from you
A screw drive quotation is only as good as the site information behind it. Nine items cover it: work through the list before you send the enquiry and the price returns as a configuration rather than a band to interpret.
Send these with your enquiry 0 of 9
What the answer should contain
- The pit depth and overhead clearance for your configuration, in writing — the two figures this page does not publish.
- The confirmed rated load, travel, stop count and door type, on the machine plate as well as the quotation.
- The electrical data: running current, starting current and the recommended protective device.
- The build or test standard, and whichever certificate or declaration goes with it.
- The maintenance schedule, the spares position for the nut assembly, and the warranty term in writing.
- Scope boundaries: freight, unloading, installation, commissioning, local approval and who does the shaft work.
Related pages worth reading next
- Screw driven elevators — the full range, with the lighter and slower members of the same family.
- Screw driven home lift, 500 kg to 5,000 kg — the residential setting of this same load band.
- Compact screw drive home elevator — the light end, for houses that do not need the heavy band.
- Hydraulic cargo lift, 1,000–2,000 kg with PLC control — the hydraulic alternative, if you need speed rather than fixity.
- Guide to screw-and-nut lifting systems — the mechanism explained in more detail.
Send your load, your travel and your building — get a configuration, not a band
Floor-to-floor heights, the shaft plan, the position of the drive and the electrical supply are usually enough to come back with a confirmed load, door layout and pit figure. If you are still comparing drive types, section 5 is the one to read before anything is ordered.
Screw drive elevator · 500–5,000 kg · 0.15 m/s · up to 15 m